Generic Work
Image 383 of Theo Brown Diaries, 1946
Public DepositedFRIDAY OCTOBER 25 1946 [Drawing: Non-removable shield] Oct 22 46 Les Sundeen estimated cost of non-removable shield as follows Bell (2 required) Labor $3.97 per 100 Tubes(2required) " $2.96 " " Assembly.$3.36 " " $10.29 ~~~~~~~~~~~~~~~~~~ Overhead @ 300% $30.87 Material Cost (16 Guage sheet). 27.00 Waste @ 5% 1.35 $ 59.22 Labor $10.29 $ 69.51 10%Contingencies 6.95 Total Estimated $76.46 Warehouse Cose Printing not included
- Creator
- Language
- English
- Identifier
- 1946_2_128
- MS02.01.26.344
- Keyword
- Year
- 1946
- Date created
- 1946-10-25
- Related url
- Resource type
- Source
- MS02.01.26.344.382
- Last modified
- 2023-09-05
Relations
Items
Permanent link to this page: https://digital.wpi.edu/show/j3860c17v