Generic Work

Image 383 of Theo Brown Diaries, 1946

Public Deposited

FRIDAY OCTOBER 25 1946 [Drawing: Non-removable shield] Oct 22 46 Les Sundeen estimated cost of non-removable shield as follows Bell (2 required) Labor $3.97 per 100 Tubes(2required) " $2.96 " " Assembly.$3.36 " " $10.29 ~~~~~~~~~~~~~~~~~~ Overhead @ 300% $30.87 Material Cost (16 Guage sheet). 27.00 Waste @ 5% 1.35 $ 59.22 Labor $10.29 $ 69.51 10%Contingencies 6.95 Total Estimated $76.46 Warehouse Cose Printing not included

Creator
Language
  • English
Identifier
  • 1946_2_128
  • MS02.01.26.344
Keyword
Year
  • 1946
Date created
  • 1946-10-25
Related url
Resource type
Source
  • MS02.01.26.344.382
Last modified
  • 2023-09-05

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/j3860c17v