Priorclave has potential to shorten throughput time, increase capacity, refine scheduling, reduce WIP, and meet customer specifications quickly without disrupting the flow of production. In order to illustrate this potential, a current state was established to benchmark against. Lean techniques such as kanban and JIT were then explored along with traditional manufacturing techniques such as MRP. Finally, a future state was developed to show a prototype system that uses lean and MRP techniques to achieve a throughput time of 2 days, and 50% reduction in WIP.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 02C021M
Advisor
Year
  • 2002
Date created
  • 2002-01-01
Resource type
Major
Rights statement

Relazioni

In Collection:

Articoli

Elementi

Permanent link to this page: https://digital.wpi.edu/show/1n79h7299