Student Work

Lean production and inventory control: a prototype model for Priorclave

公开

Priorclave has potential to shorten throughput time, increase capacity, refine scheduling, reduce WIP, and meet customer specifications quickly without disrupting the flow of production. In order to illustrate this potential, a current state was established to benchmark against. Lean techniques such as kanban and JIT were then explored along with traditional manufacturing techniques such as MRP. Finally, a future state was developed to show a prototype system that uses lean and MRP techniques to achieve a throughput time of 2 days, and 50% reduction in WIP.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 02C021M
Advisor
Year
  • 2002
Date created
  • 2002-01-01
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/1n79h7299