Student Work

The Environmental effects of sewer conversion in the Gates Brook watershed

公开

The intent of this project was to develop a design process that would analyze the effects of a sewer system conversion in the Gates Brook subwatershed. The sewer system that is presently under construction in the Gates Brook area will essentially remove part of the groundwater recharge formerly supplied by septic system effluent. The design process within this project was developed with the intention of providing a reference for future, similar watershed projects.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 99D182M
Advisor
Year
  • 1999
Date created
  • 1999-01-01
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/73666750k