Student Work

Pilot resident consultation as part of a combined heat and power system implementation.

公开

可下载的内容

open in viewer

This project was commissioned by the London borough of Merton in order to execute preliminary steps of a resident consultation process on High Path Estate as a stage in the implementation of a combined heat and power system. In designing, administering and evaluating the survey and interview portions of the consultation, several site-specific issues were highlighted, but the process intent was to be replicable elsewhere as part of installing a sustainable energy system.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • 05D035I
关键词
Advisor
Year
  • 2005
Center
Sponsor
Date created
  • 2005-01-01
地点
  • London
Resource type
Rights statement
最新修改
  • 2020-12-29

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/k643b169p