Student Work

Kaven Hall Renovation

Public

Downloadable Content

open in viewer

This project analyzed the 2021-2022 renovation of Kaven Hall which occurred in a dynamic environment with variables such as unforeseen impacts, a pandemic, and supply chain issues. Constructed in 1954, Kaven Hall is home to an ever-growing department with many areas of study. With an increasing demand on the aging building, a renovation needed to occur. Both student MQPs and WPI Facilities studied possible renovations or replacement of the building. Several updates were made in 1979 and 2000, but none addressed ADA compliance until 2021. Its location in WPI’s de-facto historical district and unclear pre-existing conditions complicated planned work. The project’s conflict resolution methods, project management, and use of construction technology were studied. The outcomes were used to create recommendations for future renovation projects.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • 65381
  • E-project-042822-131832
Keyword
Advisor
Year
  • 2022
UN Sustainable Development Goals
Date created
  • 2022-04-28
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/m326m5018