Student Work

Perceived barriers to mixed-mode ventilation in Melbourne commercial buildings

公开

可下载的内容

open in viewer

This project was completed for CSIRO to identify perceived barriers to implementing mixed-mode ventilation systems in commercial buildings in Melbourne, Australia. Use of the systems will reduce energy consumption, thereby lowering CO production. Interviews were conducted with designers and decision makers and building occupants were surveyed about workplace conditions and environmental concern. It was determined that there is potential for the use of mixed-mode ventilation in Melbourne, but many barriers do exist, particularly lack of information about the system.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • 00D147I
关键词
Advisor
Year
  • 2000
Center
Sponsor
Date created
  • 2000-01-01
地点
  • Melbourne
Resource type
Rights statement
最新修改
  • 2020-12-29

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/pg15bf456