Student Work
Rt. 122 Highway Bridge Design and Construction
ÖffentlichHerunterladbarer Inhalt
open in viewerThis project focused on the redesign of a typical two lane highway overpass. The basis of the design followed AASHTO specifications and used the LRFD method. To complement our hand calculations, we used Risa-2D to calculate live and dead loads. Along with designing the bridge, we performed a life-cycle cost analysis which included environmental impact, construction practices, and material selection.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-121809-130132
- Advisor
- Year
- 2009
- Date created
- 2009-12-18
- Resource type
- Major
- Rights statement
Beziehungen
- In Collection:
Objekte
Artikel
Miniaturansicht | Titel | Sichtbarkeit | Embargo Release Date | Aktionen |
---|---|---|---|---|
MQPFINALDRAFT.pdf | Öffentlich | Herunterladen |
Permanent link to this page: https://digital.wpi.edu/show/vm40xt136