Student Work

Mathematical Tunnel Cost Modeling

Public

Downloadable Content

open in viewer

I use empirical data and multidimensional polynomial approximation to create a model that predicts tunnel outturn cost(O) given tunnel face area (f), length (l), depth (d), density of geology (r), with a certain error. I discuss the limitations of my methods and make recommendations for improving outturn cost prediction models.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-022812-032415
Keyword
Advisor
Year
  • 2012
Center
Sponsor
Date created
  • 2012-02-29
Location
  • Melbourne
Resource type
Rights statement

Relations

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/vx021f55f