Student Work
Engineering Solutions for Ghana E-Waste Problems
公开The Engineering Solutions for Ghana E-Waste Problems MQP provides a grinder to pulverize electronic waste in Agbogbloshie, a scrap yard in Ghana. Ghanaian expertise guided the project’s focus on manufacturing and sustainable maintenance. SOLIDWORKS and ANSYS simulation tools were used to visualize and test the design. A steel prototype was assembled using the tools in Washburn Shops at WPI. Future revisions of the E-waste Recycling Grinder could scale a manufacturing plan and determine a grinder integration plan for Agbogbloshie.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- 6236
- E-project-031921-193105
- 关键词
- Advisor
- Year
- 2021
- Center
- UN Sustainable Development Goals
- Date created
- 2021-03-19
- Resource type
- Major
- Rights statement
- 最新修改
- 2022-05-16
关系
- 属于 Collection:
项目
单件
缩略图 | 标题 | 公开度 | Embargo Release Date | 行动 |
---|---|---|---|---|
|
Engineering Solutions for Ghana E-Waste - MQP Report.pdf | 公开 | 下载 |
Permanent link to this page: https://digital.wpi.edu/show/w0892d75v