Student Work
New WPI Sports & Recreation Center III: Construction Management and Constructability Analysis
ÖffentlichHerunterladbarer Inhalt
open in viewerThis project presents an alternative design to the earth-retaining structure to support lateral loading during construction of the foundation of the Worcester Polytechnic Institute new Sports and Recreation Center. The design was chosen based on soil profiles representing the earth surrounding the existing soil nail wall. Through the use of Building Information Modeling (BIM), we created a 3D model of the site to represent the existing conditions, mass excavation and total backfill of the different volumes of earth.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-031511-132023
- Advisor
- Year
- 2011
- Date created
- 2011-03-15
- Ort
- Worcester
- Resource type
- Major
- Rights statement
Beziehungen
- In Collection:
Objekte
Artikel
Miniaturansicht | Titel | Sichtbarkeit | Embargo Release Date | Aktionen |
---|---|---|---|---|
WPI_Sports_and_Rec._Center_III.pdf | Öffentlich | Herunterladen |
Permanent link to this page: https://digital.wpi.edu/show/z603r000k