Student Work

Worcester Vocational High School -- Part II

Öffentlich

This project analyzes the construction project management of the Worcester Vocational High School as observed during the months between July and December 2004. Information was gathered from the project information is gathered and utilized by the management team. Primavera Project Planner was utilized to create a schedule of one of the buildings, which was then used to track the progress allowing for the identification of any possible delays. A structural analysis was performed on the supporting structure of the gymnasium floor to determine its strength due to the increased loading conditions.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 05C005M
Advisor
Year
  • 2005
Date created
  • 2005-01-01
Resource type
Major
Rights statement

Beziehungen

In Collection:

Objekte

Artikel

Permanent link to this page: https://digital.wpi.edu/show/zw12z8492