Student Work

Water Sampling Plan For the Pueblo of Santa Ana

Público

Conteúdo disponível para baixar

open in viewer

The Pueblo of Santa Ana’s Department of Natural Resources needed improvements to their water sampling methods due to a unique local environment. The goal of this project was to create a water sampling plan comprised of sampling techniques and a water collection device for use during low flow conditions in the Pueblo’s rivers. We achieved our goal through research, interviews, and field tests. We created a guide for proper sampling protocols and designed a water optimization device for sampling water.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-101316-173521
Palavra-chave
Advisor
Year
  • 2016
Center
Sponsor
Date created
  • 2016-10-13
Localização
  • Santa Clara Pueblo
Resource type
Rights statement
Última modificação
  • 2020-11-27

Relações

Itens

Itens

Permanent link to this page: https://digital.wpi.edu/show/z890rt92x